LPT-360S

Production Lyophilizer

A 3.6 m2 shelf area pharmaceutical gmp lyophilization platform for medium-scale commercial fill-finish.

Lyopharm Tech LPT-360S Production Lyophilizer
Commercial model LPT-360S · Manufacturing reference: Command SJ-360F(T) platform
Nominal capacity
3.6 m2 shelf area
Loading format
Configurable shelf count
Condenser
Matched production condenser
Shelf / chamber
-65 to +65 C

Application fit

Designed for medium-scale commercial fill-finish

The LPT-360S is configured around the material, container or tray loading pattern rather than a generic chamber-volume claim. During selection, we review the frozen water load, expected sublimation rate, product thickness, working pressure and available utilities.

The published capacity is a selection reference. Actual throughput varies with formulation, water content, loading depth, freezing method, endpoint and the time reserved for loading, defrost and cleaning.

Published engineering reference

Commercial modelLPT-360S
Manufacturing platformCommand SJ-360F(T) platform

These values trace to the Command SJ-360F(T) platform manufacturing platform. Final electrical, dimensional and performance details are confirmed in the approved project specification.

Configuration review

Available configuration work can include chamber accessories, shelf format, vacuum instrumentation, condenser temperature, pump arrangement, control recipes, data export, electrical standard and documentation. Final specifications are confirmed in the quotation and approved technical agreement.

Configuration matrix

Options reviewed for the LPT-360S

These are engineering review categories, not a claim that every option is included in the base configuration.

Review itemHow it is configured
Vial and loading formatConfigurable shelf count; -65 to +65 C. Vial diameter, fill depth, stopper and loading map are confirmed.
Shelf and stoppering systemShelf temperature range, uniformity, cooling rate and hydraulic stoppering requirements are defined in the URS.
CIP / SIP boundaryCleaning, sterilization, drainability, sterile boundary and qualification scope are reviewed as project requirements.
Automation and validationUser roles, audit trail, batch records, backup, FAT, SAT, IQ and OQ deliverables are specified before approval.
Electrical standardVoltage, phase, frequency and connected load are confirmed for the installation country and approved configuration.
Controls and dataRecipe control, trend viewing, data export and remote-support scope are reviewed against the project.

From inquiry to delivery

A four-step equipment purchase path

Price and schedule become meaningful after the application and machine boundary are clear.

  1. 01

    Send the real workload

    Product, load, format, endpoint, cycles, utilities, country and timing.

  2. 02

    Review application and model

    Compare capacity, condenser, loading architecture, options and site interfaces.

  3. 03

    Approve the commercial file

    Confirm quotation, technical agreement, drawings, documentation, warranty and delivery terms.

  4. 04

    Build, test and hand over

    Complete the agreed FAT, export packing, shipment, commissioning and training scope.

Commercial confidence

What is defined before an order moves forward

No invented stock, delivery date or universal performance promise. The commercial file connects the machine to an approved technical basis.

01

Traceable model identity

LPT-360S / Command SJ-360F(T) platform remains visible from quotation and technical agreement through manuals, spare parts and service.

02

Approved specification

Capacity, utilities, interfaces, options and acceptance conditions are recorded before manufacturing release.

03

Factory acceptance

The agreed FAT scope can cover dimensions, controls, alarms, refrigeration, vacuum and documentation checks.

04

Export and delivery plan

Packing, shipping terms, lead time, installation access and site responsibilities are confirmed in the quotation.

05

Commissioning support

Remote support is standard; qualified projects can include on-site installation, commissioning and operator training.

06

Warranty and spare parts

Warranty scope, exclusions, service route, consumables and recommended spare parts are stated in the commercial file.

Continue the technical review

Related solutions, guides and evidence

Search all LPT-360S resources →

Product questions

LPT-360S quotation and configuration FAQ

Is the published 3.6 m2 shelf area capacity guaranteed for every product?

No. It is a model-selection reference. Product composition, frozen water, layer or fill depth, container, endpoint and full cycle schedule determine practical throughput.

Which configuration choices are available for the LPT-360S?

The chamber or loading format, condenser, vacuum arrangement, controls, electrical standard, documentation and project options are reviewed around the Command SJ-360F(T) platform manufacturing platform.

What information is needed for a technical quotation?

Send the product or formulation, load per batch or per day, container or tray dimensions, target endpoint, operating schedule, installation country, utilities and required delivery window.

How are price, lead time and warranty confirmed?

They are stated in the project quotation after the configuration and commercial scope are reviewed. The approved technical agreement takes priority over general website information.

Related models

Compare nearby capacity points

Application review

Review the LPT-360S for your process.

Share the product, batch size, container, utilities and expected production rhythm. An engineer will recommend a practical starting configuration.

Request model guidance
WhatsApp